Turnkey commercial EV charging
We work with facilities managers, landlords and developers across the Midlands to design and install networked EV charging for staff, customers and visitors. Our commercial installs range from a handful of 7kW units at a small office to fully load-balanced 22kW three-phase installations and DC rapid chargers for destination sites.
Every project starts with a load survey so we can specify the right supply upgrade, DNO liaison, groundworks, containment and back-office platform for your site.
Networked chargers with clear billing
The chargers we install integrate with leading OCPP back-office platforms so you can control access, set tariffs for staff and public users, monitor uptime and generate invoices automatically.
This makes it simple to offer EV charging as a paid amenity, recover electricity costs from tenants, or fold charging into an employee benefit scheme without adding to your admin load.
Design, DNO and installation
Commercial sites almost always need a DNO application to confirm available capacity, and often a supply upgrade or load-balancing controller. We handle the paperwork, the utility liaison and the physical installation, delivering a single point of accountability from design through to commissioning and aftercare.
Frequently asked questions
- How long does a commercial EV charging project take?
- Smaller sites can be surveyed, quoted and installed within a few weeks. Larger schemes involving a DNO supply upgrade or civil works typically take eight to twelve weeks from order.
- Can you install both AC and DC rapid chargers?
- Yes. We install AC units from 7kW to 22kW as well as DC rapid chargers, and we can advise on the right mix for your site based on dwell time, vehicle types and available supply capacity.